At Ocean Palm Villas South in Flagler Beach, Florida, a large-scale roofing project has been successfully completed across 16 residential buildings and one community center. As the engineering oversight team, Keystone Engineering played a critical role in ensuring the project met the highest standards of quality, durability, and code compliance.
In coastal environments, the true performance of a roofing system is determined not just by materials—but by the precision of its installation.
The Value of Professional Oversight
Throughout the project, Keystone Engineering provided hands-on oversight with frequent and unannounced site visits. Our role extended beyond observation—we actively verified that all aspects of the installation aligned with project specifications and industry best practices.
Key elements monitored included:
- Substrate moisture conditions
- Ambient humidity levels
- Consistency and uniformity of Spray Polyurethane Foam (SPF) application
This level of quality control ensures the roofing system will perform reliably for years to come, even in Florida’s demanding coastal climate.
Meeting Modern Building Standards
During the course of our inspections, a critical issue was identified: the original roof plywood was not fastened in accordance with current building standards.
To address this, Keystone Engineering required and verified extensive deck re-nailing to meet Florida Building Code (FBC) requirements. Ensuring proper fastener placement is essential for structural integrity—especially in high-wind regions.
By bringing the structure up to current standards, the community is now better protected against severe weather events.
Navigating Florida’s Climate
Executing a project of this scale in Florida required constant adaptability. High temperatures and unpredictable rain posed challenges to the proper installation of SPF and silicone coatings.
To maintain optimal application conditions, Keystone coordinated with the board and contractor to adjust work schedules as needed. These proactive decisions ensured materials were installed under the right environmental conditions, preserving system performance and longevity.
A Successful Project Close-Out
After a detailed and methodical process, the project was successfully completed across all buildings.
Key close-out milestones included:
- Technical Verification: Final inspections confirmed completion of all roofing work on residential buildings and the community center
- Punch List Completion: Walkthroughs ensured all detail work was addressed, including overspray remediation and installation of new impact-rated skylights
- Building Enhancements: Granulated, non-skid walkways were installed around rooftop equipment to protect the new roofing system during future maintenance
A Commitment to Quality
We extend our thanks to the Ocean Palm Villas South board for their commitment to quality and long-term planning. By prioritizing professional engineering oversight, the community didn’t just complete a roof replacement; it made a strategic investment in the durability and resilience of its property.
In coastal environments, that level of diligence makes all the difference. Contact us today for your roofing and restoration needs (321) 454-7300
AUGUST 2025 DECEMBER 2025