Keystone Engineering is proud to support the ongoing facility rehabilitation at Sand Dollar II in beautiful St. Augustine. Our team plays a vital role in ensuring the project progresses safely, accurately, and in alignment with engineering standards from start to finish.
1. Visual & Acoustic Evaluation
The project begins with a comprehensive visual and acoustical inspection performed by Keystone’s experienced inspectors. These assessments help identify concrete distress, areas of delamination, and reinforcing steel corrosion. All required excavation and repair boundaries are precisely marked to guide the contractor.
2. Pre-Pour Inspection
Once the contractor excavates and prepares the designated areas, Keystone returns to conduct a pre-pour inspection. This critical step verifies that all reinforcement, formwork, surface preparation, and repair materials meet Florida Building Code requirements and industry standards before concrete is placed.
3. Final Punchlist & Quality Review
As repairs near completion, Keystone performs a final inspection of the restored areas. A detailed punchlist is provided to ensure all adjustments are made and the project is delivered with the highest level of quality and accuracy.
From initial assessment to final verification, Keystone Engineering is committed to delivering safe, durable, and effective rehabilitation solutions for Florida’s coastal communities.