Where It Started: The 2022 Condition Survey
In January 2022, Keystone Engineering performed a non-destructive visual and acoustical condition survey of the balconies, walkways, garage, and exterior elevations at Palmas de Majorca in Cocoa Beach. The survey gathered information on the condition of the horizontal reinforced concrete balcony and walkway slabs, columns, beams, coatings, railings, and related building elements such as sliding glass doors and shutters.
A survey like this gives an association a clear picture of its building before any work begins. That information became the foundation for the concrete restoration project now underway.
The Restoration Begins
The concrete restoration project began in February 2026, and Keystone Engineering has provided construction oversight since day one. The scope includes stripping all balcony and walkway floor finishes, repairing the concrete, replacing the original railings, and applying a new decorative and protective coating system.
Step 1: Removing the Floor Finishes
Floor finishes can hide problems in the concrete below. Stripping them down to the bare slab allows workers to see any needed structural repairs, including spalled concrete, post-tensioned cable repairs, stucco repairs, concrete cracking, and other collateral building repairs.
Step 2: Locating and Excavating the Repairs
Once the slabs are exposed, our team marks each surface
spall for the contractor to excavate. Spalling often occurs when reinforcing
steel inside the concrete corrodes and expands, cracking and breaking away the
concrete around it. At the slab edges, excavation exposes the post-tensioned cables, the high-strength steel tendons that help the slab carry its load. These areas call for careful repair and close engineering oversight.
Step 3: Completing the Concrete Repairs
After the damaged concrete is removed and the steel is addressed, the slab edge is formed and new concrete is placed to restore it.
Step 4: Testing and Preparing the Surface
Before the new coating goes down, the repaired slabs go through flood testing and profiling. Flood testing checks the surface for leaks and drainage issues, while profiling prepares the concrete so the coating system bonds properly.
Step 5: Shutters, Doors, and Railings
Most of the hurricane shutters will be removed and reinstalled, or removed and replaced, depending on their age and condition. This allows concrete repairs behind them and ensures positive drainage.
The project also includes replacing all the original cored railings on the balconies and walkways with surface-mounted railings featuring an AAMA 2605 (Kynar 500XL) finish. Surface-mounted railings attach to the top of the slab instead of being set into cored holes, which removes a common path for water to reach the reinforcing steel.
The Finished Result
Once the concrete repairs are complete, a decorative and protective coating system is applied, giving each balcony and walkway a clean, durable surface. Keystone Engineering is proud to support Palmas de Majorca through each phase of this restoration, from the original condition survey to the finished balconies.